2006
For Winrock Amore – Supply and installation of Solar Panel System for 45 Barangays in Masbate, Philippines.
For Petron Corporation – Supplied and installed two (2) brand new Process Air Compressor System Package with common Air Dryer for FCCU Process Line.
For Coral Bay Nickel Corporation (HPAL Facility) – Supply of labor & materials, spare parts for the semiannual preventive maintenance of 2 x 7.5 kW, 350 bars for Bauer HP Compressor in Bataraza, Palawan.
For JG Summit Petrochemicals Corporation – Acts as an agent for Burckhardt Compression AG in the turnkey supply of labor and materials for the conversion of Labyrinth Type Sealing to Gas Tight Type Sealing of their 2 x 450 kW Labyrinth Compressors.
For Semirara Coal Mining Corporation – Supply and commissioning of 4 x 320 kW x416 kV, 8 poles, 900 rpm, “Elin” (Austria) Electric Motor.
For Petron Corporation – Supply, delivery, installation, testing and commissioning of 2 x 780 kW ”Cooper Cameron” Centrifugal Compressors for Fluid Catalytic Cracking Unit (Perto FCC).
For Coral Bay Nickel Corporation (HPAL Facility) – Supply of labor & materials, spare parts for the semiannual preventive maintenance of 2 x 7.5 kW, 350 bars Bauer HP Compressor in Bataraza, Palawan.
For Fujiname Philippines, Inc. – Supply of labor and materials, spare parts to undertake the rehabilitation of one (1) unit 30 kW Model WP4330 J.P. Sauer & Sohn Compressor.
For Philip Morris Philippines, Inc. – Supply of labor, materials and spare parts for the rehabilitation of one (1) unit 7.5 kW Bauer High Pressure Compressor.
For Lufthansa Technik Philippines – Completed supply and delivery of parts for Bauer Nitrogen Generator.
For Asia Brewery Inc. – Supply and delivery of KSB pump spare parts.
For Unilever Philippines Inc. – Supply and delivery of spare parts for KSB pumps.
For Sycwin Coating and Wires Inc. – Rehabilitation/overhaul of KSB pumps.
For NPC – Mindanao Generation – Supplied Voith Siemens Screw Pump assembly.
For Mirant Corporation – Supplied KSB pump and spare parts.