1998
For Keppel Dry-dock – Supply and installation of Major Pumps.
For Fort Bonifacio Land Development Project – Received Major Order for Wastewater Pump.
For APO Cement Corporation- Supply of Clinker Transport System.
For 1,000 MW CCPP Sta. Rita Power Plant – Supply and installation of 98) x 1,500 kW, 6.6 kV KSB Boiler Feed pumps Type HGC.
For 1,000 MW CCPP Sta Rita Power Plant – Supply and installation (4) x 1,100 kW,
6.6 kV KSB Boiler Circulating Pumps Type SEZN.
For 1,000 MW CCPP Sta Rita Power Plant – Supply and installation of (4) x 360 kW,
6.6 kV KSB Condensate Extraction Pump Type KWRT.
For 1,000 MW CCPP Sta Rita Power Plant – Supply and installation of (4) x 1,200 kW, 6.6 kV KSB Seawater Intake Pumps x SNW.
For 500 MW CCPP San Lorenzo – Supply and installation of (4) x 750 kW, 6.6 kV Boiler Feed pumps Type HGC.
For 500 MW CCPP San Lorenzo – Supply and installation (4) x 250 kW, 6.6 kV KSB Boiler Circulating Pumps Type SEZN.
For 500 MW CCPP San Lorenzo – Supply and installation of (4) x 360 kW, 6.6 kV KSB Condensate Extraction Pump Type KWRT.
For 500 MW CCPP San Lorenzo – Supply and installation of (4) x 1,200 KW, 6.6 kV KSB Seawater Intake Pumps x SNW.