2009
Honda Car Phils. – Supply and installation of solar power supply for street and perimeter lighting at Honda Plant in Laguna Technopark
Nestle Phils. – Supply and installation of picohydro systems utilizing the kinetic energy of return water from cooling tower at Lipa and Cagayan de Oro factories.
Brighten Star – Supply of High-Pressure Gas Discharge lamps for perimeter lighting at Nestle Lipa.
NPC ALLIANCE ETHYLENE Compressors – Completed the rehabilitation of 26 x 450 KW LABYRinth Piston Compressor.
600MW Kalayaan Pumped Storage Hydro Power Plant – Completed the refurbishment of 2 xB28 – 110KW Blowdown Air Compressor System.
2 x 600MW Generator of Kalayaan Pumped Storage Hydro Power Plant - Completed the supply and installation of Complete Excitation System by Voith Fuji.